Size your line or shop from your own numbers.

Put in the rate, the steps and their times. The modelers give back people, machines, the bottleneck and output.

Floor Simulator One Page: the sample line at 40 units/month: 51 people, 11 machines, Max Output 47.3 units/month, flow time 7.3 days, Bottleneck Electronics Sub-Assy S3, the value stream and the ramp.
Floor Simulator. One Page: people, machines, Max Output, flow time and the Bottleneck for the sample line, with its value stream and ramp.

Latest:Floor Simulator 0.6.0, 28 Oct 2026

The modelers

One for a production line, one for staffing a flow, one for a high-mix or repair shop. Each runs offline from one file.

Which one fits your work

Free to learn and to use

Process Modeler: Flow map: streams and steps, with the constraint flagged in red.
Process Modeler. Flow map: streams and steps, with the constraint flagged in red.

174 free guides

Browse all guides

Learning tracks, with a plan

16 tracks put the guides in order, with knowledge checks. They come with any plan.

See the tracks
The SymplProcess Toolbox listing your tools and every free calculator
The Toolbox. Your tools, then every free calculator and template, in one window.

Every tool in one window, offline

  • Installs from Edge or Chrome in one click: its own window and Start menu entry, no installer, no admin rights.
  • Works offline: the free calculators and templates, and every tool you keep in it.
  • Updates itself. When a tool has a new version, one click gets it.
  • Work saves in the browser as you go; Save file keeps a copy on your computer.

The Toolbox is free; it opens the tools you own or get on a plan. Want a file instead? Every tool still downloads as a single file that runs in the browser.