🐢 You are reading The Long Start — Module 10 of 10

You made it. This is the last module. We saved the money talk for last so you'd understand the value before we put prices on things. Missed Module 9?

The Philosophy: Make the Free Stuff Genuinely Useful

Some companies give you a "free tier" that's so limited it's basically a demo. You can look around, but you can't actually do anything. That's not us.

Our free tier includes tools that are genuinely useful on their own. You can model your processes, calculate OEE, run a 5 Whys analysis, learn about lean manufacturing, and look up any term in our glossary — all without creating an account, ever. If you never pay us a dollar, you still got value. That's the deal.

The paid tiers exist for when you need persistent data, team collaboration, and analytics — things that require a database, user accounts, and cloud infrastructure that costs us money to run.

The Three Plans

PlanPriceWhat You GetWho It's For
Free $0 forever 200+ lean & manufacturing guides
5 operations frameworks
80+ term glossary
14 free calculators (OEE, takt, yield, etc.)
9 templates with PDF/CSV export
Process Modeler (no login required)
1 facility, up to 3 processes
Basic shift reports (7-day history)
Training Academy (browse all lessons)
Anyone. Students, curious managers, supervisors who want to learn, engineers doing quick calculations. No signup required for most of it.
Pro $9.99/month (or $99/year) Everything in Free, plus:
107 hands-on knowledge checks (save & load, CSV export, scenario comparison)
Unlimited processes & facilities
Monte Carlo simulation
Manpower optimization solver
Daily Playbook & adherence tracking
Action item tracking & Kanban board
Engineering Task Tracker (My Week + My People)
Performance trends (7/14/30 day)
Pareto & root cause analysis
Full report & audit history
Save templates & auto-save
Training progress & badges
Up to 5 team members
The full platform for a single supervisor or small team. Everything you need to model, plan, report, track, and improve — all in one place. Up to 5 people.
Enterprise Custom (contact sales) Everything in Pro, plus:
Unlimited team members
Role-based access (supervisor, manager, admin)
Manager view across all members
Team-wide action item management
Multi-facility support
Live activity feed & cross-team task assignment
5S & Safety audit history across team
Leader Standard Work team adherence
Shared template library
Outlook sync (.ics export for team plans)
Priority support
Scale across your floor. For operations teams that need role-based access, multi-facility support, manager views, and cross-team coordination. Unlimited people.

Pro starts with a 7-day free trial. No credit card required. Try it. If it's not for you, you lose nothing. You don't even have to remember to cancel.

The ROI Math (Let's Get Specific)

Here's the thing about software pricing: the sticker price doesn't matter. What matters is what it saves you vs what it costs you. Let's do the math for each plan.

Pro Plan: $9.99/month = $99/year (or $9.99/mo month-to-month)

The Math

Auto-Assign uses TOC math to optimize staffing. Even a modest improvement of 5% better labor utilization on a team of 20 people at $20/hour = $41,600/year in savings.

Shift reports that take 3 minutes instead of 10 minutes save 7 minutes per report x 3 shifts x 365 days = 127 hours/year of supervisor time recovered.

Monte Carlo simulation gives you confidence ranges instead of guesses — one better planning decision per quarter easily saves thousands.

ROI: 347x. The plan pays for itself before your first shift is over.

Enterprise Plan: Custom pricing (contact sales)

The Math

Manager view + role-based access means your operations manager sees all supervisor reports across all shifts without calling anyone. One hour saved per day in status chasing = $7,500/year at $30/hour.

Cross-team action item tracking means nothing falls through shift handoffs. Even one prevented production miss per month at $5,000 each = $60,000/year.

Multi-facility benchmarking identifies best practices at your strongest site and spreads them. If Site A's OEE is 78% and Site B's is 65%, closing that gap by even half = massive output gain.

5S & Safety audit history across the team: one prevented recordable injury saves $42,000+ in direct costs.

ROI: 170-500x depending on team size and which savings you capture first.

What's Free vs Paid — The Complete Breakdown

For the people who want to know exactly where the line is:

FeatureFreePro ($9.99/mo)Enterprise (custom)
200+ Learning Guides
5 Operations Frameworks
80+ Term Glossary
14 Calculators
9 Templates (PDF/CSV export)
Process Modeler✅ (3 processes)✅ (unlimited)✅ (unlimited)
Basic Shift Reports✅ (7-day history)✅ (full history)✅ (full history)
Training Academy✅ (browse)✅ (progress & badges)✅ (progress & badges)
107 Knowledge Checks
Monte Carlo Simulation
Manpower Optimization
Daily Playbook (My Day)
Action Items & Kanban
Engineering Task Tracker
Performance Trends (7/14/30d)
Pareto & Root Cause Analysis
Full Report & Audit History
Saved Templates & Auto-Save
Up to 5 Team Members✅ (up to 15)
Role-Based Access
Manager View
Multi-Facility Support
Cross-Team Task Assignment
Live Activity Feed
Team Audit History
Leader Standard Work Adherence
Shared Template Library
Outlook Sync (.ics export)
Priority Support

Frequently Asked Questions About Pricing

Can I really use the free stuff forever?

Yes. The Process Modeler, calculators, templates, learning guides, pro demos, and glossary are free with no time limit, no login requirement, and no "upgrade to continue" popups. We mean it.

What happens when the free trial ends?

If you don't add a payment method, you drop back to the free tier. You keep access to all free tools. Your cloud data is preserved for 30 days in case you decide to resubscribe. No surprise charges.

Can I switch plans?

Yes, anytime. Upgrade instantly. Downgrade at the end of your current billing period. Prorated charges for mid-cycle upgrades.

Is there an annual discount?

Not yet, but it's coming. Watch for it.

Do I need a credit card for the free trial?

No. Sign up with Google, start the trial, use it for 7 days. If you want to keep going, add a payment method. If not, do nothing — you won't be charged.

You Made It. All 10 Modules. Congratulations.

🎉 Achievement Unlocked: The Long Start

You just read the most thorough guide to SymplProcess ever written. You now know more about this platform than most of our employees. (Kidding. Mostly.) Here's what you can do next:

Try the free Process ModelerNo signup. No login. Just start modeling your processes and see your bottleneck in 2 minutes.
Use any of the 14 free calculatorsOEE, takt time, throughput, capacity — pick one that's relevant to you right now.
Explore the Learning Hub111 guides covering everything from 5S to Value Stream Mapping. Start with whatever sounds interesting.
Create a free accountSign in with Google. Takes 5 seconds. Unlocks cloud saving for your process models.
Read the Quick Start GuideNow that you understand everything, the 12-minute Quick Start will feel like a speed run. Use it as a reference.
💬
Got questions? The Feedback page is a direct line to the team. Or ask the AI Coach (available in the app sidebar) — it knows everything you just read, and then some.

← Back to The Long Start · Module 10 of 10 · ← Module 9

🏭
Free Process Modeler
Map your production flow, find bottlenecks & optimize staffing. No login required.
Try It Free →
💾
Save your learning progress PRO
Track quiz scores, earn badges, and pick up where you left off.
Upgrade →
Free forever · No credit card

Stop reading, start modeling

Model your process flow, run simulations, optimize staffing with TOC math, and test your knowledge with 107 interactive checks — all in one platform.

Open Workbench →