Stop guessing what your line can do.
Free guides, calculators and web modelers for the plant floor. Pro tools that run offline, yours outright or on a plan.
Why paid: the pro tools run on a laptop on the floor, files stay with you. From $5 a month, or own one outright.
See all three modelers
Type the rate and the stations. Get back the people, the machines, the bottleneck and the output, with the math under every number.
Sound familiar?
Every one of these has a number behind it. Find yours.
- The line is behind and nobody agrees why.
- Everyone has a different bottleneck.
- Overtime every week, output still short.
- WIP piled up, lead times climbing.
- Changeovers eat the shift.
- Shelves full, still short the part.
Each problem and what its fix does
- The line is behind scheduleFind what is actually setting the pace
- Where is the bottleneck?Measure it instead of arguing about it
- Too much WIP, lead times too longCap what is open, shorten the wait
- Changeovers take too longMove setup work off the machine
- Overtime every weekSize hours and people to the real demand
- Repair turn time too longFind where the work order waits
- Too much inventory, still shortSet stock by item, not by feel
- See every problemFlow, capacity, quality, inventory, warehouse, MRO, daily management
Your next rate change in the Floor Simulator, start to finish
First, set the rate
The product, its parts and the rate it has to hit.
Three modelers
Know the people, machines and bottleneck for any rate before you commit to it. See Floor Simulator
Compare the three: screens, prices, trials and free versions
One for a production line, one for staffing a flow, one for a high-mix or repair shop. Each runs offline from one file. Which one fits your work
-
A production line at a rate
Floor Simulator
What does the whole line look like at this rate?
In the Complete plan, $19 a month or $249 once
How it works, step by step
-
Staffing for one flow or line
Process Modeler
How many people, where, and what output?
In the Complete plan, $19 a month or $149 once
Free web version in the browser
-
A high-mix or repair shop
Mixed Shop Modeler
Do my machines and stands have room for this mix?
In the Complete plan, $19 a month or $179 once
Free web version in the browser
Learn the method free.
Guides, calculators and templates, in your browser, no card and no account.
- 173guides
- 17calculators
- 15templates
- 16flow games
- 2web modelers
- 16learning tracks, with a plan
Most read guides, every free tool and the learning tracks
Most read
- Lean Manufacturing
- OEE
- Value Stream Mapping
- Theory of Constraints
- Line Balancing
- SMED & Quick Changeover
- Kanban & Pull Systems
- Root Cause Analysis
- Six Sigma
- 5S Methodology
- EVMS Fundamentals
- The CAM Role
- Takt Time
- Standard Work
- Total Productive Maintenance
- Inventory Management
- Warehousing & Distribution
- Preventive & Predictive Maintenance
- Calculators17
- Templates15
- Process Modelerin the browser
- Mixed Shop Modelerin the browser
- Flow gamesin the browser
- GlossaryA to Z
Learning tracks, with a plan
16 tracks put the guides in order, with knowledge checks. They come with any plan.
See the tracksPlans
$12a month
Mapping, line design and readiness work, plus the training kits. Everything in Starter, plus vsm pro, with the class workbook, line designer pro, with the yamazumi balancer, operational readiness assessment, flow basics trainer pack, with the flow starter kit.
Get Professional9 tools in all, each with a 2-day free trial. Compare the plans, or own one tool outright.
The tools by group
Each tool runs on your computer and saves to your files. Use every tool in a tier on a plan, or buy one as an offline file.
- ModelersStaffing and load models for lines, fulfillment flows, and high-mix or repair shops, plus the full floor model3 tools
- Value Stream MappingMap a production, order-to-delivery, or repair flow, find where the time goes, plan the future state1 tool
- Line DesignTakt, stations, and yamazumi stacks for assembly, pack, and overhaul lines, in one tool1 tool
- Problem Solving + TemplatesA3, 5 Why and the eight lean templates in one binder, for problems anywhere in operations1 tool
- CalculatorsEvery IE calculator in one offline file1 tool
- AssessmentScore readiness against a written rubric and see what to fix first1 tool
- TrainingThe flow basics class, self-study worksheets, and the six steps to take an area to flow1 tool
Plans: Starter$5, Professional$12, Complete$19 a month.
Every tool in one window, offline: the Toolbox
- Installs from Edge or Chrome in one click: its own window and Start menu entry, no installer, no admin rights.
- Works offline: the free calculators and templates, and every tool you keep in it.
- Updates itself. When a tool has a new version, one click gets it.
- Work saves in the browser as you go; Save file keeps a copy on your computer.
The Toolbox is free; it opens the tools you own or get on a plan. Want a file instead? Every tool still downloads as a single file that runs in the browser.

What's new
Latest: Floor Simulator 0.7.0, 4 Nov 2026. Every release

