Flow games
Why does work wait? Sixteen short games about a factory floor, each teaching one thing.
- Two buttons
- Three minutes
- No timer
Start from what is going wrong
- “We push harder and nothing comes out any faster.” The Release GameFour a Day Is Not Four DaysThe Dice RelayThe Busy TrapYour Area Over Time
- “We are always waiting on one station.” Balance the LineThe Hidden MachineThe Pit StopThe Job Shop
- “We make plenty and still cannot ship.” The Batch SplitterPush vs PullThe Beer GameNetwork Priority
- “The same problems keep coming back.” The Quality CascadeThe Red Bead ExperimentThe 5S Hunt
All sixteen
- The Release Game 3 min Letting in more work than the slowest machine can handle finishes nothing faster. It only makes every job wait longer.
- Four a Day Is Not Four Days 3 min How fast the shop works is not how long one order takes. Promise from the wrong number and you will be late.
- The Dice Relay 3 min When each station waits on the one before, bad hours pile up and good hours are wasted. The line runs below its average.
- The Busy Trap 3 min The fuller you keep a machine, the longer everything behind it waits. Past about 85% busy, it gets bad fast.
- The Batch Splitter 3 min You do not have to finish the whole pile before moving some of it on. Smaller batches finish the job sooner.
- Your Area Over Time 3 min Knowing the pile is the problem does not fix it. Digging out means starting less than you finish for a while.
- Balance the Line 3 min A line goes at the speed of its slowest person, not its average one. Help only the slowest step.
- The Hidden Machine 3 min A machine loses time three ways at once — stopping, running slow, and making bad ones. Together they hide most of its day.
- The Pit Stop 3 min Get ready while the machine is still running and it stands still less. But one crew can only be in one place.
- The Job Shop 3 min The busiest machine is whichever one today’s jobs pile onto, and every job waits behind it — even jobs that never touch it.
- Push vs Pull 3 min Making to a guess gets it wrong twice: too much of one thing, none of another. Make only what was taken.
- The Beer Game 3 min Before you order more, count what is already on its way. Forget the boxes on the road and you order twice.
- Network Priority 3 min If a finished thing needs a part from every cell, only complete kits count. Parts made ahead are just piles.
- The Quality Cascade 3 min Stop a fault where it starts. Look at the machine’s last five, not the heap of returns.
- The Red Bead Experiment 3 min Most bad days belong to the process, not the person running it. Telling off the unlucky changes nothing.
- The 5S Hunt 3 min The more there is on the bench, the longer everything takes to find. Take away what has no job.