Training

Flow Basics Trainer Pack

Everything to run a one-day flow basics class: facilitator screens, slides, the Lego game, worksheets, and supervisor sheets.

Best for: Running a one-day flow basics class: facilitator screens, slides, the Lego game, and the participant and supervisor sheets.

The day, and where each tool fits: the module map.

1 / 6The day, and where each tool fits: the module map.

Pick the right one

Not Sure This Is the One?

Features

What It Does

The full class in one pack. The Class Kit runs the day on screen with an agenda in minutes, a say-and-ask line on every module, built-in slides, and the Lego game pack (parts list, build card, layout, role cards, round rules, recorder sheet). The Self-Study Worksheets are the participant workbook and the Supervisor sheets carry it to the floor. Includes a classroom print license for the people in your class.

Class Kit

Facilitator screens for the day, agenda in minutes, say-and-ask lines, built-in slides.

Lego game pack

Parts list, build card, table layout, role cards, round rules, and a recorder sheet.

Participant workbook

The Self-Study Worksheets, one sheet per module, with live your-area math.

Supervisor sheets

Nine short sheets in everyday words for the floor after class.

Classroom print license

Print the worksheets and sheets for everyone in your class.

Screens

See It in Action

Real screens from Flow Basics Trainer Pack with its example loaded. Click any screen to enlarge; arrow keys step through.

The day, and where each tool fits: the module map.
01The day, and where each tool fits: the module map.
The ten numbers, with the class example filled in.
02The ten numbers, with the class example filled in.
Worksheet 1: the system is the limit, not the person.
03Worksheet 1: the system is the limit, not the person.
Where the time goes: days of waiting, minutes of work.
04Where the time goes: days of waiting, minutes of work.
Sheet 1: when work is late, check the setup first.
05Sheet 1: when work is late, check the setup first.
Parts spend their life waiting.
06Parts spend their life waiting.
Bundle

What's Included

ToolSold alone
Flow Basics Class Kit$59
Flow Basics Self-Study Worksheets$24
Flow Basics for Supervisors$19
À la carte total$102
Bundle price$79, save $23

À la carte total counts each tool once at its single price; bundles inside this bundle count as their parts.

Who It's For

  • CI leads and trainers running a flow basics class
  • Managers building flow skills in a team
  • Consultants teaching on site

Requirements

  • Any modern browser (Chrome, Edge, Firefox, Safari)
  • Windows, macOS, or Linux

Questions

Does it need internet or an account to run?

No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.

How does the free trial work?

Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.

How does the license work?

One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.

Do I get updates?

Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.

What is the refund policy?

Full refund within 14 days if the tool does not fit your work. Email support with your license key.

Next

Works Well With

Everything Else

Every tool is sold on its own, or use a whole tier on a plan. See all tools.