Value Stream Mapping

VSM Pro

The full value stream modeler: demand, map, analysis, and what-if.

Best for: The value stream tool: a guided first map for anyone walking an area, then current and future state, demand and takt, and what-if on the numbers, for production, order-to-delivery, or repair flows.

The map: steps, WIP and the drum, with days waiting at each pile.

1 / 4The map: steps, WIP and the drum, with days waiting at each pile.

Pick the right one

Not Sure This Is the One?

Features

What It Does

The complete value stream tool. Build current and future state maps for a product family, an order-to-delivery flow, or a repair flow, run the numbers on lead time and capacity, and test changes before you make them. Simple mode for a first map, Advanced shows everything.

Current and future state

Map both and compare lead time, WIP, and process time side by side.

Demand and takt

Set demand and available time; the map shows where each step sits against takt.

What-if

Change a cycle time, a batch size, or a buffer and see the effect on flow.

Simple and Advanced

Simple for a first map, Advanced shows every field and readout.

Save and open locally

Maps save to a file on your machine. Nothing is uploaded.

Screens

See It in Action

Real screens from VSM Pro with its example loaded. Click any screen to enlarge; arrow keys step through.

The map: steps, WIP and the drum, with days waiting at each pile.
01The map: steps, WIP and the drum, with days waiting at each pile.
What the map says: the drum, span and WIP, then where the span goes.
02What the map says: the drum, span and WIP, then where the span goes.
Advanced: level load per step, and the pile by pile plan.
03Advanced: level load per step, and the pile by pile plan.
Leadership view: one page generated from the map.
04Leadership view: one page generated from the map.
Web or offline

Free Online or Pro Offline

Free onlinePro offline download
RunsOn symplprocess.com, needs internetLocal file, no internet needed
Saves toThis browser, or your account if signed inFiles you keep, back up and share
FeaturesThe modeler: scenarios, views, save and open filesEverything on the web, plus a one-page report, paste from Excel, CSV export, side-by-side scenario compare, chart images for slides, and autosave versions
AccountOptionalNot needed to run
PriceFreeOne-time purchase, 2-day free trial

Start with the free web VSM tool →

Who It's For

  • Industrial, manufacturing, and supply chain engineers
  • CI and lean practitioners in plants, warehouses, repair shops, and offices
  • Operations leaders who own a value stream

Requirements

  • Any modern browser (Chrome, Edge, Firefox, Safari)
  • Windows, macOS, or Linux

Questions

Does it need internet or an account to run?

No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.

How does the free trial work?

Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.

How does the license work?

One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.

Do I get updates?

Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.

What is the refund policy?

Full refund within 14 days if the tool does not fit your work. Email support with your license key.

Next

Works Well With

Everything Else

Every tool is sold on its own, or use a whole tier on a plan. See all tools.