Free manufacturing calculators
Stop rebuilding the same spreadsheet. Every calculator shows its formula and works in your browser with no account.
What the calculators cover
Manufacturing calculators for OEE, takt time, cycle time, throughput, line balancing, first pass yield, DPMO and sigma level, downtime cost, changeover time, batch size, capacity utilization, labor productivity, safety stock, kanban sizing and work in process (WIP) with Little's Law.
- 17 free calculators
- No sign-up required
- OEE Calculator Equipment Calculate Overall Equipment Effectiveness: Availability × Performance × Quality.
- Takt Time Calculator Flow Takt in seconds, units per hour and operators needed from shift time and demand.
- Cycle Time Calculator Flow Measure how long it takes to complete one unit from start to finish.
- First Pass Yield Calculator Quality Calculate the percentage of units that pass quality inspection the first time.
- Throughput Calculator Output Determine your process output rate per hour, shift, or day.
- DPMO & Sigma Level Calculator Six Sigma Convert defect rates to DPMO and sigma level for Six Sigma analysis.
- Cpk Calculator Quality Cp, Cpk and PPM out of spec from spec limits and mean and sigma, or from pasted data.
- Line Efficiency Calculator Balance Measure how balanced your production line is across all stations.
- Downtime Cost Calculator Cost Cost per hour of unplanned downtime: lost margin, idle labor, overhead and scrap.
- MTBF and MTTR Calculator Equipment Mean time between failures, mean time to repair and inherent availability from hours and failures.
- Labor Productivity Calculator Workforce Measure output per labor hour and cost per unit for your team.
- Safety Stock Calculator Inventory Determine optimal safety stock levels to prevent stockouts.
- Work in Process (WIP) Calculator Flow Little's Law: solve for WIP, throughput or lead time from the other two.
- Kanban Calculator Inventory Number of kanban cards from demand, lead time, safety factor and container size.
- Capacity Utilization Calculator Capacity Find out what percentage of your total production capacity you are using.
- Changeover / SMED Calculator Setup Analyze changeover times and estimate savings from SMED improvements.
- Optimal Batch Size Calculator Planning Balance setup costs vs holding costs to find the economic batch quantity.
No calculators foundTry a different search term.
Free Process Modeler. Map multi-stream production flows, find the bottleneck, see the critical path and plan staffing. Free, no login needed.
Open the modelerNeed just one? Each calculator is also sold alone as its own Pro file, with a 2-day free trial. See the single calculators