Tools & Downloads

Plans

A plan opens every offline tool in its tier for as long as it is active, including new tools added to that tier. Prefer to own a tool outright? Every tool is also sold on its own.

Launch preview. Every tool downloads free through November 30. Plans start when the store opens.

Starter

Everyday IE and planning math and problem solving for one engineer, planner, or lead.
$9 / month
A3 Pro5 Why ProIE Templates ProIE Calculator Pro 5 tools
  • All 14 calculators (IE Calculator Pro)
  • All 8 templates (IE Templates Pro)
  • A3 Pro and 5 Why Pro
Opens with the store

Professional

Mapping, line design and readiness work, plus the training kits.
$19 / month
VSM ProVSM Class WorkbookLine Designer ProYamazumi Balancer +8 tools
  • Everything in Starter
  • VSM Pro and VSM Class Workbook
  • Line Designer Pro, Yamazumi Balancer, Flow Starter Kit
  • Operational Readiness Assessment
  • Flow Basics Trainer Pack and Self-Study Worksheets
Opens with the store

Complete

The full set, including the offline modelers, for engineers who model lines, shops, warehouses, and repair flows.
$29 / month
Process ModelerMixed Shop ModelerFloor Simulator +3 tools
  • Everything in Professional
  • Process Modeler and Mixed Shop Modeler offline
  • Floor Simulator
Opens with the store

What Each Plan Opens

ToolsStarterProfessionalComplete
Modelers --✓ 3
Value Stream Mapping -✓ 2✓ 2
Line Design + Flow -✓ 3✓ 3
Problem Solving ✓ 3✓ 3✓ 3
Templates ---
Calculators ---
Assessment -✓ 1✓ 1
Training -✓ 2✓ 2

Plan or Own It?

A plan fits if

  • You use tools from more than one group
  • You want new tools in your tier as they ship
  • It is a work expense paid monthly or yearly

Owning fits if

  • You need one or two tools and want them for good
  • You would rather pay once (or own everything)
  • Each tool has a 2-day free trial first

Questions

What happens to my files if I cancel?

Your saved files are yours and stay on your computer. Tools downloaded on a plan keep working to the end of the paid period plus 14 days, then lock. Files open again in any licensed or plan copy.

Do the tools need internet?

No. Every tool runs offline from one file. Download a fresh copy from your account to pick up updates.

Can I change plans?

Yes, from your account. Upgrades take effect right away; Stripe prorates the difference.

Team or site use?

Plans are per person. For a team or a site, see team licenses.