Assessment

Operational Readiness Assessment

Score a production area against a written readiness rubric and see what to fix first.

Best for: Scoring one area against a written rubric before a rate increase, new product or line move.

Assess: score each criterion against written levels, with evidence.

1 / 4Assess: score each criterion against written levels, with evidence.

Pick the right one

Not Sure This Is the One?

Features

What It Does

A structured assessment for a rate increase, a new product, or a line move. Score each domain against written criteria, see the gaps in one view weakest first, run a quick capacity check, and get a ranked action list. Compare against the last assessment to show progress.

Written rubric

Every score has the criteria for every level on the same page.

Gap view

All domains on one screen, weakest first, with the math behind each score.

Action list

Each gap carries the next step, owner, and date. CSV export.

Capacity check

Hours needed against hours available, as FTE or machines and load percent.

Compare

Domain-by-domain change against the last assessment.

Local files

Assessments save to your machine; compare areas or repeat over time.

Screens

See It in Action

Real screens from Operational Readiness Assessment with its example loaded. Click any screen to enlarge; arrow keys step through.

Assess: score each criterion against written levels, with evidence.
01Assess: score each criterion against written levels, with evidence.
Gap view: where the area falls short, by category.
02Gap view: where the area falls short, by category.
Action list: what to fix first.
03Action list: what to fix first.
Capacity check: required hours against what the area has.
04Capacity check: required hours against what the area has.
Web or offline

Free Online or Pro Offline

Free onlinePro offline download
RunsOn symplprocess.com, needs internetLocal file, no internet needed
Saves toThis browser, or your account if signed inFiles you keep, back up and share
FeaturesThe modeler: scenarios, views, save and open filesEverything on the web, plus a one-page report, paste from Excel, CSV export, side-by-side scenario compare, chart images for slides, and autosave versions
AccountOptionalNot needed to run
PriceFreeOne-time purchase, 2-day free trial

Start with the free readiness roadmap →

Who It's For

  • Engineers preparing an area for a rate increase or new product
  • Managers who need one view of readiness gaps
  • Consultants running plant assessments

Requirements

  • Any modern browser (Chrome, Edge, Firefox, Safari)
  • Windows, macOS, or Linux

Questions

Does it need internet or an account to run?

No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.

How does the free trial work?

Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.

How does the license work?

One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.

Do I get updates?

Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.

What is the refund policy?

Full refund within 14 days if the tool does not fit your work. Email support with your license key.

Next

Works Well With

Everything Else

Every tool is sold on its own, or use a whole tier on a plan. See all tools.