IE Templates Pro
Eight IE templates in one offline binder: FMEA, fishbone, 5S, SMED, kaizen, gemba, PDCA, process elimination.
Best for: All eight IE templates in one binder file, for people who use several of them.
Not Sure This Is the One?
What It Does
The free web templates, built out. Keep many documents in one binder file, score FMEAs and 5S audits against written scales, draw a real fishbone, split SMED elements internal and external, and roll every action from every document into one list.
One binder file
Many documents of any template type in one file, with status, owner, and date.
FMEA
S, O, D with the 1 to 10 criteria visible, RPN, priority, revised RPN, and a Pareto chart.
Fishbone
Rendered fishbone from the 6M categories, each cause marked to verify, verified, or ruled out.
5S audit
Scored against written criteria, with audit history and a trend chart per area.
SMED
Internal and external elements, before and after changeover time with the math shown.
Process elimination
Value class per step, eliminate, combine, rearrange, simplify, before and after hours.
Kaizen, gemba, PDCA
Charter, observation log, and cycle log as clean structured forms.
Action roll-up
Every action from every document in one table, overdue flagged, CSV export.
See It in Action
Real screens from IE Templates Pro with its example loaded. Click any screen to enlarge; arrow keys step through.
What's Included
| Tool | Sold alone |
|---|---|
| Fishbone Pro | $12 |
| FMEA Pro | $12 |
| Gemba Walk Pro | $9 |
| Process Elimination Pro | $12 |
| Kaizen Charter Pro | $9 |
| 5S Audit Pro | $12 |
| PDCA Pro | $9 |
| SMED Pro | $12 |
| À la carte total | $87 |
| Bundle price | $49, save $38 |
À la carte total counts each tool once at its single price; bundles inside this bundle count as their parts.
Free Online or Pro Offline
| Free online | Pro offline download | |
|---|---|---|
| Runs | On symplprocess.com, needs internet | Local file, no internet needed |
| Saves to | This browser, or your account if signed in | Files you keep, back up and share |
| Features | The modeler: scenarios, views, save and open files | Everything on the web, plus a one-page report, paste from Excel, CSV export, side-by-side scenario compare, chart images for slides, and autosave versions |
| Account | Optional | Not needed to run |
| Price | Free | One-time purchase, 2-day free trial |
Start with the free web templates →
Who It's For
- Engineers and CI leads who run these templates every week
- Quality and safety leads tracking FMEAs and 5S audits over time
- Maintenance and MRO leads running equipment FMEAs and SMED on setups and turns
- Teams that want every action in one list
Requirements
- Any modern browser (Chrome, Edge, Firefox, Safari)
- Windows, macOS, or Linux
Questions
Does it need internet or an account to run?
No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.
How does the free trial work?
Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.
How does the license work?
One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.
Do I get updates?
Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.
What is the refund policy?
Full refund within 14 days if the tool does not fit your work. Email support with your license key.
Works Well With
A3 Pro
One-page A3 problem solving that runs offline and prints true 11x17.
Free now, $39 after launch
5 Why Pro
Branching 5 Why root cause analysis with evidence, checks, and actions.
Free now, $29 after launch
IE Calculator Pro
Every IE calculator from the site in one offline workbook, with scenarios, sensitivity, and the math shown.
Free now, $39 after launchEverything Else
Every tool is sold on its own, or use a whole tier on a plan. See all tools.