Everything Bundle
Every offline tool in the store, one purchase.
Best for: Owning every available tool outright with one purchase. To use the tools without buying them, see the plans.
What It Does
Every modeler, value stream tool, line design tool, problem-solving tool, calculator, template, assessment, and training kit available today, licensed to you. Download each one from your account as you need it. Includes the Floor Simulator. Tools released later are sold separately.
Every tool available today
All modelers, VSM, line design, A3, 5 Why, calculators, templates, readiness, and training.
One license key
One key covers every tool; each download is stamped with your name.
Updates
Updates within each tool's major version, from your account.
What's Included
À la carte total counts each tool once at its single price; bundles inside this bundle count as their parts.
Who It's For
- IE and CI leads who use the whole toolkit
- Consultants who carry every tool to every site
- Instructors who teach across the full set
Requirements
- Any modern browser (Chrome, Edge, Firefox, Safari)
- Windows, macOS, or Linux
Questions
Does it need internet or an account to run?
No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.
How does the free trial work?
Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.
How does the license work?
One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.
Do I get updates?
Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.
What is the refund policy?
Full refund within 14 days if the tool does not fit your work. Email support with your license key.
Everything Else
Every tool is sold on its own, or use a whole tier on a plan. See all tools.