Flow Starter Kit
Six steps to move an area to flow, with your own numbers and built-in simulations.
Best for: Moving one area to flow, on the floor, in the warehouse, or in a repair shop, with your numbers, a checklist, a two-day workshop and daily floor scripts.
Not Sure This Is the One?
What It Does
A start-to-finish kit for moving an area to flow: put your numbers in, see what they mean, and get a checklist. Includes a one-pager, a presenter view, a two-day workshop with facilitator guide, and daily floor scripts.
Your numbers
Fill in a few numbers and see what they mean for your area.
Checklist
A printable checklist built from your answers.
Built-in simulations
Dice and flow sims that show why it works.
Two-day workshop
Facilitator guide, presenter view, and screen view.
Every day on the floor
Short scripts for daily use after the workshop.
Executive summary
One-pager for leadership.
See It in Action
Real screens from Flow Starter Kit with its example loaded. Click any screen to enlarge; arrow keys step through.
Free Online or Pro Offline
| Free online | Pro offline download | |
|---|---|---|
| Runs | On symplprocess.com, needs internet | Local file, no internet needed |
| Saves to | This browser, or your account if signed in | Files you keep, back up and share |
| Features | The modeler: scenarios, views, save and open files | Everything on the web, plus a one-page report, paste from Excel, CSV export, side-by-side scenario compare, chart images for slides, and autosave versions |
| Account | Optional | Not needed to run |
| Price | Free | One-time purchase, 2-day free trial |
Start with the free flow games →
Who It's For
- Engineers leading a flow change in one area: a cell, a repair shop, a warehouse flow, an office
- Managers who need the one-pager and the workshop
- Facilitators running a two-day flow workshop
Requirements
- Any modern browser (Chrome, Edge, Firefox, Safari)
- Windows, macOS, or Linux
Questions
Does it need internet or an account to run?
No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.
How does the free trial work?
Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.
How does the license work?
One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.
Do I get updates?
Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.
What is the refund policy?
Full refund within 14 days if the tool does not fit your work. Email support with your license key.
Works Well With
Flow Basics Self-Study Worksheets
Self-teaching worksheets, one per flow concept: idea, worked example, practice, your area.
Free now, $24 after launch
VSM Pro
The full value stream modeler: demand, map, analysis, and what-if.
Free now, $79 after launch
WIP + Little's Law Calculator Pro
WIP, throughput, and lead time or repair turn time: solve for any one from the other two.
Free now, $9 after launchEverything Else
Every tool is sold on its own, or use a whole tier on a plan. See all tools.