Built for Industrial Engineers
Two powerful modelers. One connected platform. Zero spreadsheets.
The Flow Modeler lets you map your entire operation โ multi-stream, with cross-stream dependencies, cycle times, capacity math, and critical path analysis. The Mixed Shop Modeler handles mixed-model production environments with routing diagrams and factory floor simulation.
Think of it as Visio โ but with real math behind it. Every node has cycle time, staffing, availability, yield, and variation built in. Change a number, and the entire model recalculates. Then run Monte Carlo simulation, what-if scenarios, and 15+ analysis tools.
๐
Current-State & Future-State Modeling
Model your operation as it is today. Save it. Then create a future-state scenario with different staffing, cycle times, or process changes. Compare throughput side by side.
๐ฌ
Capacity Studies & Line Balancing
Run capacity analysis across your entire flow. See where you have excess capacity and where you're constrained. Test "what-if" headcount changes without touching the floor.
๐
Justify Headcount with Data
Show management exactly why you need 2 more people at Picking โ not with a gut feel, but with a model that shows the constraint, the throughput gain, and the dollar impact per shift.
๐๏ธ
New Line & Facility Planning
Designing a new production line or warehouse layout? Build the process model first. Validate throughput targets, staffing requirements, and lead times before breaking ground.
Open the Process Planner โ