Calculators

DPMO + Sigma Calculator Pro

DPMO, yield, and sigma level from defects and opportunities.

Best for: Just this calculator, built out offline. DPMO, yield, and sigma level from defects and opportunities.

Calculate: inputs, results, and the formula with your numbers.

1 / 3Calculate: inputs, results, and the formula with your numbers.

Pick the right one

Not Sure This Is the One?

Features

What It Does

The DPMO + Sigma calculator from the site, built out and offline: named scenarios side by side, a sensitivity sweep on any input, a shared area profile, units toggles, and a printable report with every formula shown with your numbers. Files open in IE Calculator Pro if you add the full set later.

Math shown

Every result shows the formula with your numbers in it.

Named scenarios

Save several input sets and compare them side by side with deltas.

Sensitivity

Sweep one input over a range, see the table and the chart.

Area profile

Shift hours, days, and demand entered once and reused.

Export

CSV, printable report, copy as text.

Upgrade path

Same file format as IE Calculator Pro. Nothing to redo if you add the full set.

Screens

See It in Action

Real screens from DPMO + Sigma Calculator Pro with its example loaded. Click any screen to enlarge; arrow keys step through.

Calculate: inputs, results, and the formula with your numbers.
01Calculate: inputs, results, and the formula with your numbers.
Named scenarios side by side, with deltas.
02Named scenarios side by side, with deltas.
Sensitivity: sweep one input and read the table and chart.
03Sensitivity: sweep one input and read the table and chart.
Web or offline

Free Online or Pro Offline

Free onlinePro offline download
RunsOn symplprocess.com, needs internetLocal file, no internet needed
Saves toThis browser, or your account if signed inFiles you keep, back up and share
FeaturesThe modeler: scenarios, views, save and open filesEverything on the web, plus a one-page report, paste from Excel, CSV export, side-by-side scenario compare, chart images for slides, and autosave versions
AccountOptionalNot needed to run
PriceFreeOne-time purchase, 2-day free trial

Start with the free web DPMO + Sigma calculator →

Who It's For

  • Engineers, planners, and leads who run this calculation every week
  • Anyone who needs to show the math behind the number
  • Teams comparing options before a change

Requirements

  • Any modern browser (Chrome, Edge, Firefox, Safari)
  • Windows, macOS, or Linux

Questions

Does it need internet or an account to run?

No. The download is a single file that opens in any modern browser and runs offline. Your data stays on your machine.

How does the free trial work?

Enter your email and the trial copy downloads right away. It is the full tool for 2 days from the first download, then it locks. Files you save during the trial are yours and open in the licensed copy. One trial per email per tool.

How does the license work?

One purchase covers one named user on their own computers. Your copy is stamped with your name and license key. A team license covers 5 named users. See the licensing page for the full terms.

Do I get updates?

Yes. Updates within the same major version are included. Sign in to your account to download the latest copy.

What is the refund policy?

Full refund within 14 days if the tool does not fit your work. Email support with your license key.

Next

Works Well With

Everything Else

Every tool is sold on its own, or use a whole tier on a plan. See all tools.