1. Home
  2. Glossary
  3. Cellular Manufacturing

Cellular ManufacturingWork Cells

Arranging equipment and workstations into a compact cell (often U-shaped) that processes a family of similar products in flow.

  • Lean
  • Flow

Cellular manufacturing groups the machines and operations needed to make a family of parts into a single, tightly arranged cell (frequently U-shaped) instead of scattering them across functional departments. This slashes transport, WIP, and walking while enabling one-piece flow.

Cells make line balancing, cross-training, and flexible staffing to takt time far easier, and they are a natural application of group technology.

Designing a cell: pick a part family by routing similarity (group technology), place the machines in process order with the smallest spacing the work allows, and staff the cell to takt. With takt at 90 seconds and 250 seconds of work content across the cell, 250 / 90 = 2.8, so three operators, each walking a loop of stations. As demand changes, the number of operators changes and the layout stays.

A U shape puts the first and last stations next to each other, so one operator can load and unload, and lets operators share work across the bend. Measure the before and after with walking distance per unit (metres), WIP between stations (units) and lead time through the cell (minutes). The cell design guide covers the layout rules and the line balancing guide the staffing math.

Go deeper

Related terms

Browse all glossary terms