1. Home
  2. Glossary
  3. One-Piece Flow

One-Piece FlowSingle-Piece Flow

Moving a single unit through each step at a time, with no batching or queues between operations.

  • Flow
  • Lean

One-piece flow is the lean ideal of making and moving products one unit at a time through consecutive steps, rather than in batches. Each piece is completed and passed forward immediately.

It minimizes WIP and lead time, instantly exposes defects (the next operator catches them at once), and is best realized in balanced cells running to takt time. It requires short changeovers and reliable processes.

Go deeper

Related terms

Browse all glossary terms