Changeover (or setup) is the elapsed time from the last good piece of one product to the first good piece of the next. Long changeovers force large batch sizes, which inflate inventory and lead time.
Reducing changeover time through SMED is therefore one of the highest-leverage lean improvements: it unlocks smaller batches, faster response, and higher OEE.