Availability

The percentage of planned production time that equipment is actually running; one of the three OEE factors.

  • Maintenance

Availability measures how much of the planned production time a machine is actually running, after subtracting downtime losses such as breakdowns, changeovers, and material shortages. It is calculated as Run Time ÷ Planned Production Time.

It is the first of the three factors in Overall Equipment Effectiveness (Availability × Performance × Quality). Improving availability is the focus of TPM and SMED.

Example. A shift has 480 minutes with two 15-minute breaks planned, so Planned Production Time is 450 minutes. The machine logged 35 minutes of breakdowns and 40 minutes of changeovers, so Run Time is 375 minutes and Availability is 375 / 450 = 83.3%. Breaks come out before the ratio because they are planned, not lost; a plant that counts breaks as downtime will report a lower number than its neighbour for the same machine.

The definition decides what the number can tell you. Put changeovers inside availability losses (the standard OEE treatment) and SMED projects show up as availability gains. Put minor stops under 5 minutes in performance, not availability, or the two factors double count. The free OEE calculator splits lost hours by category; the OEE guide covers the boundary rules.