Continuous Flow

Producing and moving one unit at a time through a sequence of steps with no stops or batches between them.

  • Flow
  • Lean

Continuous flow is the ideal lean state in which a product moves through every value-adding step without stopping, waiting, or batching. In its purest form it is one-piece flow.

Flow exposes problems immediately (there is no inventory to hide them), dramatically shortens lead time, and is enabled by balanced work, short changeovers, and reliable equipment.

Flow is worth the effort because of the arithmetic. Ten steps of one minute each, batched in lots of 50, give a lead time of 10 x 50 = 500 minutes for the first finished unit. The same ten steps in one-piece flow finish the first unit in 10 minutes, and a defect at step 3 is found at step 4 one minute later, not 50 units later.

The conditions are strict: every step must be close to takt, changeovers short enough to run every part every day, and equipment reliable enough that one stop does not starve everything downstream. Where a step cannot meet them, connect it with a FIFO lane or a supermarket instead of a push batch. The one-piece flow guide covers the transition from batches.