1. Home
  2. Glossary
  3. DMAIC

DMAICDefine, Measure, Analyze, Improve, Control

The five-phase data-driven improvement cycle at the heart of Six Sigma for improving existing processes.

  • Six Sigma

DMAIC is the structured roadmap of Six Sigma projects: Define the problem and goals, Measure the current state with data, Analyze to find root causes, Improve by testing and implementing solutions, and Control to lock in the gains.

It is the disciplined cousin of PDCA, emphasizing measurement, statistical analysis, and a formal control plan so improvements do not erode over time.

What each phase produces. Define: a charter with the problem in numbers, the scope and the metric. Measure: a validated measurement system (Gage R&R) and a baseline, such as 3.1% defective over 8 weeks. Analyze: tested causes, not a list of suspects. Improve: a change piloted and shown to move the metric. Control: a control plan, an updated standard and a chart that someone owns after the team leaves.

Projects run 3 to 6 months and fail most often in Measure, when the baseline is taken from a system nobody checked, and in Control, when the chart is handed over without a reaction plan. Not every problem needs DMAIC: a cause that is obvious once the data is plotted goes straight to PDCA. The Six Sigma guide covers the tools used in each phase.

Go deeper

Related terms

Browse all glossary terms