1. Home
  2. Glossary
  3. Visual Management

Visual ManagementVisual Controls

Making the status of work, performance, and standards instantly visible so anyone can understand the situation at a glance.

  • Lean

Visual management makes the state of an operation understandable in seconds without asking anyone, through boards, color-coding, floor markings, andon lights, shadow boards, and KPI displays. The aim is for normal-versus-abnormal to be obvious instantly.

Visual controls are what make 5S, standard work, and tier meetings function. When the workplace "talks," problems surface immediately and self-correct faster.

The test of a visual control is the three-second rule: can someone who does not work in the area tell, within three seconds and without asking, whether the area is on plan? Hour-by-hour boards (plan versus actual by hour, with the reason for each miss), colour-coded min/max marks on bins and racks, shadow boards for tools and floor lanes for WIP all pass it. A spreadsheet printed and pinned up does not.

Keep it in the hands of the people doing the work: operators fill in the hour-by-hour board, the team leader escalates the misses at the tier meeting, and the board changes when the problem changes. Boards that stay identical for a year have stopped being used. The visual management guide covers board design and the 5S guide the floor-level controls.

Go deeper

Related terms

Browse all glossary terms