A yamazumi chart ("to stack up" in Japanese) is a stacked-bar visualization where each bar is a station or operator and each segment a work element, compared against a takt time line. Overloaded and underloaded stations are obvious at a glance.
It is the primary working tool for line balancing: planners drag work elements between bars to even out the load and recover hidden capacity without adding people.
Building one: time each work element at each station (from a time study or video), stack them as segments in a bar per station, and draw the takt time as a horizontal line. With takt at 120 seconds and stations at 95, 118, 135 and 80 seconds, station 3 is over takt and sets the line's real pace at 135, while station 4 idles 40 seconds per cycle. Total work content is 428 seconds, so 428 / 120 = 3.6: the line needs four stations balanced near 107 seconds each.
Colour the segments by value-added, necessary and waste so the rebalance removes waste before it moves work. Rebalance by moving whole elements, respecting precedence, and keep each station a few seconds under takt for variation. The yamazumi guide covers the rebalance and the line efficiency calculator gives balance loss from the station times.