1. Home
  2. Flow
  3. The Batch Splitter: Live

The Batch Splitter: Live

No luck in this one at all — same machines, same speeds, same towels. The whole spread down the board is the batch sizes people chose.

Live room · best with 3–12 ~8 min to play · ~29 min in the room Run sheet: scripted and timed Solo version