1. Home
  2. Flow
  3. The Pit Stop: Live

The Pit Stop: Live

Everyone runs the same changeover against the same clock, twice, and the room puts the two rounds side by side.

Live room · best with 3–15 ~10 min to play · ~30 min in the room Run sheet: scripted and timed Solo version