1. Home
  2. Glossary
  3. Continuous Improvement

Continuous ImprovementCI / Kaizen

The ongoing, organization-wide effort to improve products, services, and processes through small incremental changes.

  • Lean

Continuous improvement (CI) is the relentless pursuit of better: eliminating waste and raising quality through many small changes plus occasional breakthrough events. It is the cultural engine behind both lean and Lean Six Sigma.

CI relies on disciplined cycles such as PDCA, structured problem-solving like A3, and habits like kaizen and the improvement kata.

What separates a CI culture from a CI program is the cadence. A program has events; a culture has a daily or weekly loop in which a team names a problem from its board, tries one small change, checks the metric, and keeps or discards it. A team that runs 20 of these loops a year gets better faster than one that runs two big events, because the problem-solving skill compounds.

Measure it with implemented improvements per person per year, the share of problems closed within a week of being raised, and whether the KPI the change targeted actually moved. Ideas logged but never tried are a sign the approval loop is too long. The CI culture guide covers the leadership routines that keep the loop running.

Go deeper

Related terms

Browse all glossary terms