First Pass Yield (FPY) is the fraction of units that come through a step right the first time, before any rework, repair, or re-inspection. It is a truer quality measure than final yield, which can hide a large "hidden factory" of rework.
Multiplying FPY across all steps gives Rolled Throughput Yield, which exposes how a chain of "pretty good" steps can produce poor overall quality.
Example. A test station receives 1,000 units in a week. 920 pass on the first attempt, 60 fail and pass after rework, 20 are scrapped. Final yield is 980 / 1,000 = 98%, which looks fine. First pass yield is 920 / 1,000 = 92%, and the 60 reworked units carried 0.4 hours each of extra labour, 24 hours in the week that the final yield figure hid.
Three steps at 92%, 95% and 97% FPY give a rolled throughput yield of 0.92 x 0.95 x 0.97 = 84.8%: one unit in six touched some rework somewhere. Track FPY per station on the tier board, Pareto the failure codes weekly, and expect the number to drop when you first measure it honestly. The first pass yield calculator rolls the steps for you.