1. Home
  2. Glossary
  3. Rolled Throughput Yield

Rolled Throughput YieldRTY

The probability a unit passes through every step of a process defect-free: the product of each step's first pass yield.

  • Six Sigma
  • Quality

Rolled Throughput Yield (RTY) is the product of the first pass yields of every step in a process. It reveals the true end-to-end quality that single-step yields hide.

The math is sobering: ten steps at 95% FPY each give an RTY of only about 60%. RTY exposes the cumulative "hidden factory" of rework and is a key metric in Six Sigma.

Go deeper

Related terms

Browse all glossary terms