ScrapWaste / Reject

Material or product that fails quality requirements and cannot be reworked, representing pure loss.

  • Quality

Scrap is output that does not meet specification and cannot be economically reworked; it must be discarded or recycled. It represents the most visible internal failure cost in the cost of quality.

Scrap consumes material, machine time, and labor with zero return, and at a bottleneck it also destroys throughput. Reducing scrap is a primary aim of SPC, poka-yoke, and Six Sigma.

Measure it in both units and hours. 2% scrap at a 400-unit-a-day line is 8 units; if each carried 1.5 hours of labour and machine time by the point it was scrapped, that is 12 hours a day lost, plus material. Scrap found at final test cost more than scrap found at the first operation, so record where it was found and where it was made: they are usually different stations.

A scrap report needs a reason code per unit, a Pareto by code weekly and an owner for the top code. Scrap that is scrapped without a code goes into "other", and a line with 30% in "other" has no scrap data. At the bottleneck, each scrapped unit is lost sales, not just lost cost. See the cost of quality guide for where scrap sits among the failure costs.