1. Home
  2. Glossary
  3. Bottleneck

BottleneckConstraint

The process step with the lowest capacity, which sets the maximum throughput of the entire system.

  • Flow

A bottleneck is the resource or step with the least capacity in a process; it governs the throughput of the whole system. An hour lost at the bottleneck is an hour lost for the entire plant, while an hour saved anywhere else is often a mirage.

Identifying and systematically exploiting the bottleneck is the heart of the Theory of Constraints and its Drum-Buffer-Rope scheduling method.

Go deeper

Related terms

Browse all glossary terms