Kanban

A visual signaling system that triggers production or replenishment based on actual consumption rather than forecasts.

  • Lean
  • Flow

Kanban (Japanese for "signboard") is a visual signal (a card, bin, or empty space) that authorizes the production or movement of material only when downstream consumption creates the need. It is the practical engine of a pull system.

By capping the number of kanban in circulation, you cap WIP and let demand pull work through the value stream, preventing overproduction.

Sizing a loop. Number of kanban = (average daily demand x replenishment lead time in days x (1 + safety factor)) / container quantity. A part used 200 a day, replenished in 2 days, with a 20% safety factor and 50 per container: 200 x 2 x 1.2 / 50 = 9.6, so 10 cards. That caps line-side stock at 500 units and puts a ceiling on WIP that a forecast-driven schedule cannot give.

Two patterns cover most cases: a production kanban that tells a supplying step to make a container, and a withdrawal kanban that lets a consuming step take one. Start a loop with more cards than the math says, then remove one at a time until a shortage appears, and fix the cause before removing the next. The kanban calculator runs the sizing and the kanban guide covers the card rules.