A Manufacturing Execution System (MES) manages production as it happens on the floor: dispatching work orders, tracking WIP, collecting machine and quality data, enforcing routings, and ensuring traceability. It sits between top-floor ERP planning and the shop-floor equipment.
MES provides the real-time data behind live OEE, genealogy/traceability, and paperless work instructions, increasingly fed by IIoT connectivity.
What a plant uses it for day to day: operators confirm operations and quantities against a work order, downtime is logged with a reason code when a machine stops, quality results are recorded at the step they were taken, and the as-built record (serials, lots, who did what and when) is assembled as the unit moves. That record is what makes traceability possible without a paper traveller.
The reason-code list decides whether the data is useful. Fifteen clear codes with an "other" that is reviewed weekly beats two hundred nobody picks correctly. The MES also carries the hour-by-hour count against the plan, which is the source for an honest schedule adherence number. The MES guide covers selection and the boundary with ERP, and ERP systems the planning side.