MuriOverburden

Unreasonable strain on people or equipment caused by poor design or uneven demand.

  • Lean
  • Safety

Muri is overburden: pushing people or machines beyond their reasonable limits. For people it shows up as fatigue, ergonomic injury, and error; for equipment as accelerated wear and breakdowns.

Muri is often caused by mura (unevenness) and is reduced by leveling work, designing good standard work, and improving ergonomics. It is the third of the three Ms of waste.

Where it shows up. A station loaded to 110% of takt so the operator runs every cycle; a lift of 25 kg from floor level forty times an hour; a machine run at 120% of rated speed to catch up a late order; a supervisor covering two lines. Each produces errors, injuries or breakdowns that then cause the unevenness (mura) that caused the overburden in the first place.

Find it in the data: stations whose cycle time exceeds takt on a yamazumi chart, ergonomic risk scores above the action level, machines run above nameplate, overtime hours per person above a threshold. The remedy is design: balance the work, level the schedule, fix the lift. Exhorting people to work safely at an overloaded station does not work. See the heijunka guide for leveling and the ergonomics guide for the physical side.