1. Home
  2. Glossary
  3. Muda

MudaWaste

Any activity that consumes resources but creates no value for the customer.

  • Lean

Muda is the Japanese word for waste: any activity that absorbs resources without adding value the customer would pay for. The classic seven wastes (extended to the 8 wastes) are overproduction, waiting, transport, over-processing, inventory, motion, defects, and unused talent.

Muda is one of the "3 Ms" of waste alongside mura (unevenness) and muri (overburden), and the latter two are often the upstream causes of the former.

Spotting it on the floor. Walk a part's route and time what happens to it: being cut, welded or assembled is value; being moved, counted, waited on, inspected or reworked is not. On a typical first walk the value-adding share of lead time is under 5%. Overproduction is listed first because it creates the others: making ahead of need generates inventory, transport, storage and the defects hidden in the pile.

Not all non-value work can go at once. Inspection required by a customer or regulation, and transport the layout forces, are necessary non-value-added until the cause is removed. Classify each step as value, necessary non-value or waste, and attack waste first. The 8 wastes guide gives examples of each in production and office work, with the question to ask at each.

Go deeper

Related terms

Browse all glossary terms