1. Home
  2. Glossary
  3. Standard Operating Procedure

Standard Operating ProcedureSOP

A documented, step-by-step instruction for consistently performing a routine task or process.

  • Quality
  • Lean

A Standard Operating Procedure (SOP) is a documented set of step-by-step instructions for carrying out a routine operation the same way every time. It captures the agreed best-known method and is essential for training, compliance, and consistency.

SOPs are closely related to standard work: SOPs describe how to do a task, while standard work also ties the method to takt, sequence, and standard WIP. Both are living documents updated through kaizen.

A usable SOP fits on one or two pages: purpose and scope, who performs it, required tools and materials, the numbered steps with the key points that make each step right (torque, sequence, what to look for), safety notes at the step they apply to, and the record to be kept. Photos beat paragraphs. A 20-page SOP is read once at training and never again.

Give each SOP an owner, a revision number and a review date, and keep the live copy at the point of use. The best check of an SOP is to hand it to a trained person from another area and watch whether they can do the task from it. The SOP guide covers writing and controlling them; the standard work guide covers the stricter form tied to takt.

Go deeper

Related terms

Browse all glossary terms