5S Audit Checklist and Scorecard
Score one area on the five Ss, out of 25, and list the actions.
Example loaded: CNC Cell 4, first shift.
Filled boxes are tinted. Click a box to go to it.
Get the Plant Floor Briefing: one free template like this every 2 weeks
One guide, one free tool, one problem fixed. Every 2 weeks by email. No spam, unsubscribe any time.
How to run a 5S audit
- Audit the same area at a set time. Same boundaries every time, so the trend means something. Note the shift.
- Score each S against the questions. Use the check questions on each card. If you are between two scores, take the lower one and write why.
- Take photos. A score without a photo is an opinion. A photo of the cluttered bench makes the finding clear and shows progress next month.
- Write the actions. One line per finding, with an owner and a date. Start with what is going well.
- Share it on the spot. Walk the results with the area lead before you leave, then post the scorecard at the area board.
- Track the trend. Plot the total for each audit. A falling Sustain score is the early warning that the other four will follow.
5S audit example: CNC Cell 4
A filled scorecard from a first-shift audit of a three-machine CNC cell.
| S | Score | Finding |
|---|---|---|
| Sort | 4 | Red-tag area cleared last week. One box of obsolete fixtures under machine 2. |
| Set in order | 3 | Shadow board in place, but 3 of 22 tools missing from it. No marked spot for the inspection cart. |
| Shine | 2 | Chips and coolant on the floor behind machine 3. Coolant leak at the pump not reported. |
| Standardize | 3 | Standard photo posted for the bench; none for the machines. Cleaning list has no names. |
| Sustain | 2 | Two of the last four audits were skipped. Actions from the last audit still open. |
| Total | 14 / 25 | 14 ÷ 25 = 56%, graded Acceptable (13 to 17) |
Actions: work order for the pump leak today (maintenance), names on the cleaning list by Friday (cell lead), mark a spot for the inspection cart (cell lead). Shine and Sustain are the lowest, so the next audit checks those first. For the method behind each S, see the 5S methodology guide.
Why this tool matters
5S is not about cleaning; it is about making abnormal conditions visible at a glance. A well-organized workplace shows problems at once: missing tools, excess WIP, safety hazards. Without regular audits, even a good 5S start drifts back within weeks. The scorecard creates accountability and trend data: you can see whether each area is improving or slipping.
Facilitator tip
Take photos. A score of 2 means little without context. A photo of the cluttered workstation makes the score actionable. Compare photos month to month; visible progress is what keeps people going. Always start with something positive before noting gaps.
Frequently asked questions
What is a 5S audit?
A short, scored check of one area against the five Ss: Sort, Set in order, Shine, Standardize and Sustain. It shows whether the area is holding its 5S standard and which S is slipping, so the team knows where to act.
How is a 5S audit scored?
Each S gets a score from 1 (not started) to 5 (exemplary), for a total out of 25. Score against written criteria and photos of what good looks like, so two auditors give the same area the same score.
How often should you do a 5S audit?
Weekly or every two weeks for an area that is still building the habit, then monthly once scores hold steady. Audit at a regular time, and rotate auditors so the area does not tune itself to one person.
What do the 5 Ss mean?
Sort: remove what is not needed. Set in order: a marked place for everything that is. Shine: clean, and inspect while cleaning. Standardize: write down and post what good looks like. Sustain: keep doing it through audits and routine.
Who should do the 5S audit?
Someone from outside the area, with a person from the area walking along. The outsider sees what the team has stopped noticing; the team member explains and owns the actions.