Gemba Walk Checklist
Record what you see on the floor and the actions it needs.
Example loaded: Assembly Line 2, material flow.
Filled boxes are tinted. Click a box to go to it.
Get the Plant Floor Briefing: one free template like this every 2 weeks
One guide, one free tool, one problem fixed. Every 2 weeks by email. No spam, unsubscribe any time.
How to run a gemba walk
- Pick a theme. One focus per walk, such as changeovers, material flow or safety near misses, so you look closely instead of everywhere.
- Tell the area you are coming. Explain the purpose: to see the work and the problems, not to check up on people.
- Stand and watch. Pick a spot and watch one full cycle or more. Note waits, walking, searching and workarounds.
- Ask open questions and listen. Start with what is going well, then ask what is making the job harder. Write down the answers in their words.
- Record observations by category. Safety, quality, flow, 5S and people. Then write the actions with an owner and a date.
- Close the loop. Start the next walk by reporting back on the actions from the last one. That is what builds trust.
Gemba walk example: Assembly Line 2
Notes from a 25-minute walk by the operations manager with the line supervisor. Theme: material flow.
| Category | Observation |
|---|---|
| Safety | End of the line: Forklift and walkway cross with no mirror. [Transport] |
| Quality | Station 5: About one unit an hour reworked for a misaligned bracket; the operator fixes it without logging it. [Defects] |
| Flow | Station 3: Waited 4 minutes for fasteners while we watched; the kanban card was in the operator's pocket. [Waiting] |
| 5S | Station 4: Two empty totes and a broken fixture stored under the bench. [Inventory] |
| People | Line side racks: "The bins run out right after break because the water spider is on break too." [Waiting] |
| Actions | Mirror at the crossing (facilities, Friday). Log bracket rework for a week, then 5 Whys (quality engineer). Stagger the water spider's break (supervisor, Monday). |
| Positive | Station 1 operator built a simple stop for the label position; ask them to show the other stations. |
Most of what was found never shows in the shift report: the rework is not logged and the wait is short. That is why the walk matters. See the gemba walk guide and leader standard work for building the walk into a routine.
Why this tool matters
Go and see is one of the most useful lean habits, and one of the most skipped. Leaders who stay in the office decide from reports. Leaders who walk the floor decide from what is actually happening. Unstructured walks turn into social tours. This checklist gives the walk a frame: safety first, then quality, flow, 5S and people, so you see what familiarity hides.
Facilitator tip
Ask, do not tell. The best gemba question is: what is making your job harder today? Then listen. Do not solve it on the spot; capture it, assign it, and follow up. A leader who follows up earns trust. One who does not trains the floor to stop speaking up.
Frequently asked questions
What questions should you ask on a gemba walk?
Open questions about the work: What is making your job harder today? What happened the last time this stopped? How do you know this part is good? Where do you wait? What would you change first? Then listen, and write it down.
How often should leaders do a gemba walk?
Supervisors daily, managers a few times a week, senior leaders weekly is a common pattern. Regular and short beats rare and long. Put it in leader standard work so it happens on busy days too.
How long should a gemba walk take?
Twenty to thirty minutes for one area. Spend most of it standing in one place watching the work, not walking past it.
What is the difference between a gemba walk and an audit?
An audit checks the area against a standard and scores it. A gemba walk is for the leader to understand the work and the problems people face. Use the 5S audit to score; use the gemba walk to learn and to remove obstacles.
What should you not do on a gemba walk?
Do not blame, solve every problem on the spot, or turn it into a social tour. Do not walk past people without explaining why you are there. And do not skip the follow-up: actions that never close teach people to stop telling you things.