FMEA Template and Worksheet
List failure modes, score each one, and rank them by RPN.
Example loaded: cover assembly station.
Filled boxes are tinted. Click a box to go to it.
Get the Plant Floor Briefing: one free template like this every 2 weeks
One guide, one free tool, one problem fixed. Every 2 weeks by email. No spam, unsubscribe any time.
How to fill in an FMEA
- Set the scope and the team. One process or one design, with the people who know it: engineering, quality, production and maintenance.
- List the failure modes step by step. For each process step or function, ask how it could fail. Use a process flow so nothing is skipped.
- Write the effect and the cause. The effect is what the customer or next process sees. The cause is why the failure happens, written so it can be fixed.
- Score severity, occurrence and detection. Use written 1 to 10 scales so scores are consistent. The RPN calculates on each row.
- Act on high severity first, then high RPN. Name the action, the owner and the date. Prevention (lower occurrence) beats detection.
- Re-score after the action. Record the new occurrence or detection and the new RPN, and keep the FMEA current when the process changes.
FMEA example: cover assembly station
Three rows from a process FMEA for the station that fits and bolts an oil-tight cover onto a gearbox housing.
| Failure mode | Effect | Cause | Control | S | O | D | RPN | Action and new RPN |
|---|---|---|---|---|---|---|---|---|
| Bolt under-torqued | Oil leak at the customer | Torque tool drifts out of calibration | Weekly tool audit | 8 | 4 | 6 | 192 | Torque and angle monitoring that rejects the part in station. D to 2: 8 × 4 × 2 = 64 |
| Gasket missing | Oil leak at the customer | Gasket not presented at the station | Operator visual check | 8 | 3 | 7 | 168 | Fixture sensor that will not clamp without a gasket. D to 2: 8 × 3 × 2 = 48 |
| Wrong label | Wrong part number at the customer | Label printed for the previous model | Scan at shipping | 5 | 5 | 4 | 100 | Print the label on scan of the serial number. O to 2: 5 × 2 × 4 = 40 |
The first row ranks highest at 8 × 4 × 6 = 192. Both leak rows carry severity 8, so they are worked first even before comparing RPNs. Note that the gasket action changes detection, not occurrence: the gasket can still be missed, but the part can no longer leave the station without one. The FMEA guide covers the rating scales in more depth.
Why this tool matters
FMEA is risk management before the failure. Instead of waiting for failures and reacting, you ask: what could go wrong, how bad would it be, and would we catch it? The RPN (severity × occurrence × detection) ranks which risks to attack first. High severity with poor detection is the biggest blind spot. That is where the effort goes.
Facilitator tip
Do not rank by RPN alone. Act on any severity of 9 or 10 whatever its RPN; that is why the 2019 AIAG-VDA handbook moved to Action Priority. Prefer actions that lower occurrence, such as error-proofing the cause, over adding another inspection.
Frequently asked questions
How is RPN calculated?
Risk Priority Number = Severity × Occurrence × Detection, each scored 1 to 10. A failure mode with severity 8, occurrence 4 and detection 6 has an RPN of 8 × 4 × 6 = 192. The worksheet multiplies it for you on each row.
What is a good RPN?
There is no universal cut-off. RPN ranks failure modes against each other in one FMEA; it is not a pass mark. Always act on high severity (9 or 10) whatever the RPN, because a rare, well-detected safety failure can still have a low RPN.
What do severity, occurrence and detection mean?
Severity is how bad the effect is for the customer or the next process. Occurrence is how likely the cause is to happen. Detection is how likely your current controls are to catch it before it leaves; a high detection score means it is hard to catch.
What is the difference between a PFMEA and a DFMEA?
A design FMEA looks at how the product design could fail to do its job. A process FMEA looks at how the manufacturing or assembly process could fail to make the part to the design. The same worksheet works for both; pick the type at the top.
What is Action Priority in FMEA?
The AIAG and VDA FMEA handbook (2019) ranks rows as high, medium or low Action Priority from a table of severity, occurrence and detection, instead of multiplying them. It weights severity first, which fixes the main weakness of RPN. If your customer requires AIAG-VDA, use their AP table alongside this worksheet.