1. Home
  2. Glossary
  3. Autonomous Maintenance

Autonomous MaintenanceJishu Hozen

The TPM pillar in which operators take ownership of basic equipment care: cleaning, inspecting, lubricating, and detecting abnormalities.

  • Maintenance

Autonomous maintenance is the first pillar of Total Productive Maintenance. Operators are trained to perform routine cleaning, inspection, lubrication, and tightening, and to spot early signs of deterioration before they become breakdowns.

By giving operators ownership of "their" machines, it frees skilled maintenance technicians for higher-value predictive and improvement work, and dramatically improves OEE by catching problems early.

It is rolled out in seven steps: initial cleaning, countermeasures for sources of contamination and hard-to-reach places, cleaning and lubrication standards, general inspection training, autonomous inspection, standardization, and self-management. Most plants stall between steps 3 and 4 because the inspection training was skipped and operators were handed a checklist without being shown what a loose belt or a weeping seal looks like.

Keep the daily routine short: 5 to 10 minutes at shift start, with the checks on a one-page standard with photos and a tag system for abnormalities the operator finds but cannot fix. Count tags raised and tags closed each week. The autonomous maintenance guide walks the seven steps; the TPM guide places the pillar in the wider program.

Go deeper

Related terms

Browse all glossary terms