1. Home
  2. Glossary
  3. FIFO

FIFOFirst-In, First-Out

A sequencing discipline ensuring the oldest item is processed or shipped first, preserving order and freshness.

  • Flow
  • Supply Chain

FIFO (First-In, First-Out) processes items in the order they arrived. In production, a FIFO lane is a controlled inventory buffer between two steps that enforces sequence and caps WIP, a key building block of connected flow when continuous flow isn't feasible.

FIFO prevents aging, obsolescence, and mixed-sequence defects, and is essential in food, pharma, and any operation with shelf-life or traceability requirements.

Sizing a FIFO lane. Downstream consumes one unit every 2 minutes and the upstream step stops for up to 20 minutes for a changeover, so the lane needs at least 20 / 2 = 10 units to keep downstream running through a changeover, plus a few for ordinary variation: a lane of 12 marked on the floor. When the lane is full, the upstream step stops. That rule is what makes it a FIFO lane rather than a pile.

Lanes are physical: a roller conveyor, numbered floor positions or a rack with one entry and one exit, so sequence cannot be broken without effort. Date or sequence labels on each unit make a jump visible at audit. FIFO lanes connect steps that run at different rates or on different shifts; where the downstream step needs a choice of parts, a supermarket with kanban replaces it. See the material flow guide.

Go deeper

Related terms

Browse all glossary terms