1. Home
  2. Glossary
  3. Reorder Point

Reorder PointROP

The inventory level at which a replenishment order should be placed to avoid a stockout during the lead time.

  • Supply Chain

The reorder point (ROP) is the inventory level that triggers a new order. It equals expected demand during the replenishment lead time plus safety stock to cover variability.

Set it too low and you risk stockouts; too high and you carry excess inventory. ROP works with the EOQ to define a complete reorder policy and is the math behind two-bin kanban systems.

Example. A part is used 50 a day on average, the supplier lead time is 10 days, and the plant wants to cover demand variation with 150 units of safety stock. ROP = 50 x 10 + 150 = 650 units. When on-hand plus on-order drops to 650, a new order is placed, and the 500 units expected to be used over the lead time plus the 150 buffer carry the line until it arrives.

The two inputs that drift are lead time and daily usage. Review both quarterly from actual receipts and issues, not from the master data as it was set at launch. A part whose usage doubled with a new program will stock out on the old ROP. The safety stock calculator sets the buffer from demand and lead time variation at a chosen service level, and gives the ROP with it.

Go deeper

Related terms

Browse all glossary terms