Safety is the foundation of any operation: no production target justifies harm to a person. A mature safety system combines hazard elimination, engineering controls, procedures, training, and (above all) a culture where everyone is empowered to stop unsafe work.
Safety and lean reinforce each other: 5S removes hazards, ergonomics reduces injury, and standard work builds in safe methods. Performance is tracked with metrics like TRIR.