A water spider (mizusumashi) is a highly skilled material handler who runs a fixed, timed milk-run route delivering parts and kits to line-side and removing finished goods and empty containers, so value-adding operators never have to leave their stations to fetch materials.
By separating material logistics from value-added work, the water spider keeps the line flowing to takt and is a key enabler of JIT replenishment and pull.
Sizing the role. List each line-side location with its parts, the container quantity and the usage rate, then set a route cycle, say 30 minutes, and check that every location can be covered within it: a part used 1 a minute from a bin of 40 is safe on a 30-minute loop; a part used 2 a minute from a bin of 40 is not and needs a larger bin or a shorter loop. Time the full lap with stops; it must fit the cycle with slack.
The water spider is a trained, usually senior operator, not the newest hire, because the role sees every station and is the first to notice a shortage or a quality problem. Measure it by line stops for material (target zero) and lap time against the cycle. The water spider guide covers route design and standard work for the role; the material flow guide the wider replenishment system.