1. Home
  2. Glossary
  3. Kingman's Equation

Kingman's EquationVUT Equation

A queueing formula showing wait time rises sharply with utilization and variability.

  • Flow

Kingman's equation (the VUT equation) approximates the wait time at a workstation as the product of three factors: Variability, Utilization, and process Time. The utilization term is non-linear: as utilization approaches 100%, wait time and WIP blow up toward infinity.

It is the mathematical reason lean keeps slack capacity and attacks variability: you can buy shorter lead times either by reducing utilization or by reducing variability, and reducing variability is usually free.

Go deeper

Related terms

Browse all glossary terms