Schedule AdherencePlan Attainment

The percentage of the planned production that was actually completed on time and in the right sequence.

Schedule adherence measures how closely actual production matched the plan — the right products, in the right quantity, in the right sequence, on time. It is a key daily delivery metric distinct from raw output volume.

High adherence signals a stable, predictable operation; chronic misses point to upstream variability, unrealistic planning, or bottlenecks. It is a staple KPI on tier boards.