IE Methods & Tools
The core industrial engineering toolkit.
- 17 guides, each free to read
- About 3.5 hours of reading
- 85 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
The working toolkit of an industrial engineer, in the order you usually need it: stabilize the work (standard work, 5S, SMED), design it (line balancing, cells, time studies, batch size, material flow), and fix it (error proofing, A3, Pareto, FMEA, root cause, DOE, kaizen events), with the 5 Whys and the fishbone diagram in depth at the end.
The run, 17 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 Standard Work 14 min
- 2 SMED & Quick Changeover 13 min
- 3 5S Methodology 12 min
- Checkpoint 4 Line Balancing 13 min
- 5 Cell Design & Layout 14 min
- 6 Time Studies 15 min
- 7 Poka-Yoke (Error Proofing) 12 min
- Checkpoint 8 A3 Problem Solving 13 min
- 9 Pareto Analysis (80/20) 11 min
- 10 FMEA 14 min
- 11 Batch Size Optimization 12 min
- Checkpoint 12 Material Flow & Logistics 13 min
- 13 Root Cause Analysis Deep Dive 15 min
- 14 Design of Experiments (DOE) 16 min
- 15 Kaizen Event Leadership 14 min
- Checkpoint 16 5 Whys Root Cause Analysis 12 min
- Boss: the record 17 Fishbone (Ishikawa) Diagram 11 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- New industrial and manufacturing engineers
- Technicians and leads moving into an engineering role
- Engineers from other disciplines who now own a production area
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 17 guides to get the completion record.
Try a sample question
What does SMED stand for?
- ASingle Machine Exchange of Dies
- BSingle-Minute Exchange of Die, targeting changeover under 10 minutes
- CStandard Method for Equipment Design
- DSix Methods for Efficient Delivery
Show the answer
B. SMED targets "single-minute" (under 10 minutes) changeover. Developed by Shigeo Shingo to enable small-batch production.
From the check after SMED & Quick Changeover.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- Manufacturing Leadership8 guides. Lean leadership behaviors, daily management, and culture.
- All learning tracks16 tracks, from lean basics to earned value