Quality & Measurement

OEE, SPC, process capability, and measurement systems.

  • 7 guides, each free to read
  • About 1.5 hours of reading
  • 35 knowledge-check questions, with a plan
Start the track Read guide 1 free

Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans

UCLLCL

What the track covers

How to measure a process and trust the numbers: equipment effectiveness, control charts, capability, the cost of poor quality, audits that check the checks, measurement systems, and reading the drawing the part is measured against.

The run, 7 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.

Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.

What a plan adds

  • A 5-question knowledge check after each guide, with the reasoning shown for every answer
  • Guides unlock in order: score 4 of 5 to open the next one
  • Progress saved to your email, so you can pick up on another computer
  • A completion record with a verification link you can share
  • Every other learning track and the advanced knowledge checks
Start the track

Plans start at $5 a month and include the offline tools in their tier. Compare plans

Who it is for

  • Quality engineers and technicians
  • Process engineers who own SPC charts or capability studies
  • Supervisors who report OEE or scrap and want to read the numbers right

How the track works

  1. Read the guide. It is the same free guide anyone can open.
  2. Take the 5-question knowledge check at the end of it.
  3. Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
  4. Finish all 7 guides to get the completion record.

Try a sample question

What is the primary purpose of a control chart?

  1. ATrack production volume
  2. BDistinguish between common cause (normal) and special cause (abnormal) variation so you respond correctly to each
  3. CMonitor employee performance
  4. DCalculate defect rates
Show the answer

B. Common cause = leave the process alone (improve the system). Special cause = investigate and remove the specific cause. Mixing these responses (tampering) makes things worse.

From the check after Statistical Process Control.

Other learning tracks