The Process Architect's Blueprint
Aerospace manufacturing systems, from theory to production ramp.
- 16 guides, each free to read
- About 3.5 hours of reading
- 80 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
The track for engineers who want to design how work flows, not only time it. It starts with how a make shop differs from an assembly shop, works through the queueing math (Little's Law and Kingman's equation), takt, line balancing and the constraint, then the floor systems that hold a design in place, and ends with a production ramp.
The run, 16 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 Process Architect Philosophy 18 min
- 2 Little's Law for Practitioners 17 min
- 3 Kingman's Equation (VUT) 15 min
- Checkpoint 4 Takt Time for Aerospace 14 min
- 5 Yamazumi Charts & Line Balancing 12 min
- 6 Theory of Constraints (Aerospace) 12 min
- 7 CONWIP Production Control 10 min
- Checkpoint 8 ERP Data Integrity & Black Books 11 min
- 9 Advanced Gemba Walks 10 min
- 10 Water Spider Logistics 9 min
- 11 Assembly Pitch Boards 9 min
- Checkpoint 12 Standard Work & TWI 10 min
- 13 Toyota Kata for Manufacturing 9 min
- 14 Change Management for Manufacturing 11 min
- 15 Lean Maturity Assessment 22 min
- Boss: the record 16 Production Ramp Management 20 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Industrial and manufacturing engineers in low-rate, high-mix assembly such as aerospace
- Engineers moving from time studies and routings to designing the production system
- Leads planning a rate increase or a new line
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 16 guides to get the completion record.
Try a sample question
What is the correct formula for Little's Law?
- AWIP = Cycle Time × Throughput
- BCycle Time = Throughput ÷ WIP
- CThroughput = WIP × Cycle Time
- DCycle Time = WIP ÷ Throughput
Show the answer
D. Little's Law: CT = WIP / TH. Equivalently, WIP = CT × TH. Cycle Time equals Work-in-Process divided by Throughput.
From the check after Little's Law for Practitioners.
Other learning tracks
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- Manufacturing Leadership8 guides. Lean leadership behaviors, daily management, and culture.
- All learning tracks16 tracks, from lean basics to earned value