Lean Foundations
From getting started to takt, cycle time and lead time.
- 14 guides, each free to read
- About 3 hours of reading
- 70 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
The starting track. It covers what lean is for, how to see waste, how to map a value stream, how flow and pull work, and the improvement habits (kaizen and Six Sigma) that keep it going, and ends with takt time and how it differs from cycle time and lead time. Each guide is short and builds on the one before.
The run, 14 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 Getting Started Guide 10 min
- 2 Lean Manufacturing 15 min
- 3 8 Wastes (TIMWOOD+S) 12 min
- Checkpoint 4 Value Stream Mapping 15 min
- 5 Theory of Constraints 14 min
- 6 Push vs Pull Systems 12 min
- 7 One-Piece Flow 12 min
- Checkpoint 8 Jidoka (Built-In Quality) 13 min
- 9 Kanban Systems 14 min
- 10 Heijunka (Production Leveling) 13 min
- 11 Kaizen 12 min
- Checkpoint 12 Six Sigma 15 min
- 13 Takt Time 12 min
- Boss: the record 14 Takt vs Cycle Time vs Lead Time 8 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- New engineers, supervisors and team leads meeting lean for the first time
- People moving into operations from another field
- Teams that want one shared vocabulary before a kaizen event
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 14 guides to get the completion record.
Try a sample question
What is the core objective of lean manufacturing?
- AReduce headcount
- BMaximize customer value while minimizing waste
- CIncrease machine utilization to 100%
- DImplement as many tools as possible
Show the answer
B. Lean is about delivering maximum value to the customer with minimum waste, not about cutting people or maximizing utilization.
From the check after Lean Manufacturing.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- Manufacturing Leadership8 guides. Lean leadership behaviors, daily management, and culture.
- All learning tracks16 tracks, from lean basics to earned value