Equipment & Maintenance
TPM, autonomous maintenance, and equipment reliability.
- 5 guides, each free to read
- About 1 hour of reading
- 25 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
Keeping equipment running: the TPM system and its losses, what operators own in autonomous maintenance, choosing preventive or predictive work, coding and analyzing downtime, and the andon response that turns a stop into a fix.
The run, 5 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- Maintenance planners, technicians and reliability engineers
- Production supervisors who share the line with maintenance
- Engineers starting a TPM pilot on one machine
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 5 guides to get the completion record.
Try a sample question
What is the key difference between preventive and predictive maintenance?
- ACost
- BPreventive is time/usage-based (replace every 1000 hours); predictive is condition-based (replace when vibration exceeds threshold)
- CPreventive is better
- DPredictive requires computers
Show the answer
B. PM follows a schedule regardless of condition. PdM monitors actual condition and intervenes when degradation is detected; more efficient but requires monitoring technology.
From the check after Preventive & Predictive Maintenance.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- Lean Master Practitioner20 guides. Four modules, from foundations to leadership.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Manufacturing Leadership8 guides. Lean leadership behaviors, daily management, and culture.
- All learning tracks16 tracks, from lean basics to earned value