Lean Master Practitioner
Four modules, from foundations to leadership.
- 20 guides, each free to read
- About 5 hours of reading
- 100 knowledge-check questions, with a plan
Knowledge checks, progress and the completion record come with any plan, from $5 a month. See plans
What the track covers
The long track for people who run lean, not just learn it. Four modules move from the origins of the Toyota Production System and value stream mapping, through flow, pull, leveling and changeover, to quality and problem solving, and finish with leadership, strategy deployment and sustaining the gains.
The run, 20 stops. Read a guide to the end and it gets a boot print on this map. Pass its knowledge check and it gets the X.
- Start 1 Lean Thinking Origins 18 min
- 2 Value Stream Mapping 20 min
- 3 The 8 Wastes Deep Dive 16 min
- Checkpoint 4 5S System Design 14 min
- 5 Visual Management Systems 15 min
- 6 One-Piece Flow Design 16 min
- 7 Pull System Architecture 18 min
- Checkpoint 8 Heijunka (Production Leveling) 15 min
- 9 SMED & Quick Changeover 14 min
- 10 Total Productive Maintenance 16 min
- 11 A3 Problem Solving 15 min
- Checkpoint 12 Root Cause Analysis Toolkit 16 min
- 13 Statistical Process Control 18 min
- 14 FMEA for Practitioners 17 min
- 15 Poka-Yoke Design 14 min
- Checkpoint 16 Lean Leadership Behaviors 15 min
- 17 Coaching for Improvement 14 min
- 18 Hoshin Kanri (Strategy Deployment) 16 min
- 19 Building a CI Culture 14 min
- Boss: the record 20 Sustaining Gains 13 min
Every guide in the list is free to read on its own. The track puts them in order and adds a check after each one.
What a plan adds
- A 5-question knowledge check after each guide, with the reasoning shown for every answer
- Guides unlock in order: score 4 of 5 to open the next one
- Progress saved to your email, so you can pick up on another computer
- A completion record with a verification link you can share
- Every other learning track and the advanced knowledge checks
Plans start at $5 a month and include the offline tools in their tier. Compare plans
Who it is for
- CI engineers and lean coordinators who lead events and coach teams
- Engineers preparing for a lean practitioner role or certification
- Managers who sponsor lean work and want to judge it well
How the track works
- Read the guide. It is the same free guide anyone can open.
- Take the 5-question knowledge check at the end of it.
- Score 4 or more to mark the guide done and open the next one. Missed questions show the right answer and why.
- Finish all 20 guides to get the completion record.
Try a sample question
What constraint drove the creation of the Toyota Production System?
- AToyota had too many workers
- BToyota could not compete on scale: small volume, many models, no capital
- CToyota wanted to copy Ford
- DJapanese government mandated lean
Show the answer
B. TPS was invented because Toyota could not afford mass production. They had to find ways to produce efficiently at small volumes with limited capital.
From the check after Lean Thinking Origins.
Other learning tracks
- The Process Architect's Blueprint16 guides. Aerospace manufacturing systems, from theory to production ramp.
- Lean Foundations14 guides. From getting started to takt, cycle time and lead time.
- IE Methods & Tools17 guides. The core industrial engineering toolkit.
- Quality & Measurement7 guides. OEE, SPC, process capability, and measurement systems.
- Equipment & Maintenance5 guides. TPM, autonomous maintenance, and equipment reliability.
- Manufacturing Leadership8 guides. Lean leadership behaviors, daily management, and culture.
- All learning tracks16 tracks, from lean basics to earned value